Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the really-simple-ssl domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6121
Etna Green Streetscape Phase II - Eisler Landscapes
Select Page

Etna Green Streetscape Phase II

815 Freeport Rd, Pittsburgh, PA 15215

The Etna Green Streetscape Phase II project is an excellent example of integreated Green Infrastructure in one comprehensive project. Coordinating sidewalk renovations along the central business district of Etna with multiple property owners was the biggest challange in this project.

The second phase involved the reconstruction of the south side of Butler Street between Winschel and Freeport Streets as well as the reconstruction of the south side of Freeport Street between Butler Street and Cherry Alley.

AT A GLANCE

  • 2,400 cubic feet of underground stormwater storage

  • 1,800 SF of Pavedrain pervious pavers

  • 6,280 SF of new concrete sidewalk, 550 LF of curb for bump-outs, 6 curb ramps, 660 LF of decorative trench grates and tree grates.