815 Freeport Rd, Pittsburgh, PA 15215

The Etna Green Streetscape Phase II project is an excellent example of integreated Green Infrastructure in one comprehensive project. Coordinating sidewalk renovations along the central business district of Etna with multiple property owners was the biggest challange in this project.

The second phase involved the reconstruction of the south side of Butler Street between Winschel and Freeport Streets as well as the reconstruction of the south side of Freeport Street between Butler Street and Cherry Alley.

AT A GLANCE

  • 2,400 cubic feet of underground stormwater storage

  • 1,800 SF of Pavedrain pervious pavers

  • 6,280 SF of new concrete sidewalk, 550 LF of curb for bump-outs, 6 curb ramps, 660 LF of decorative trench grates and tree grates.